Message from Caltrans
Renovation of the Posey Tube Portal Buildings
The Project
Caltrans will perform a historical renovation of the Posey Tube portal buildings and replace the pedestrian handrail inside of the tube. The work will include sandblasting and repainting the buildings, historical renovation of the sidewalks leading up to the portal, and retrofitting the inside of the building
What to Expect
Work will take place at the two portal buildings, in Alameda and in the Jack London district of Oakland.
• In Oakland, scaffolding around the Posey Tube portal building will block parking adjacent to the building along Harrison Street and both sides of 4th. Also, the sidewalk behind the building will be blocked. A Pedestrian Detour will be provided.
• Pedestrian and bicycle access through the Posey tube will be blocked from February to May. A shuttle will be provided and signage indicating how to contact the shuttle will be posted at both entrances to the Posey Tube pedestrian walkways.
Project Schedule
The project is scheduled to start construction in January 2016 and to be completed in July 2016.
Project Updates
Stationary mounted signs and changeable message signs (CMS) will be strategically placed to provide information regarding the project’s closures and detours.
Contact
For more information you can call or email:
Marcus Wagner, Caltrans Public Information Officer
Marcus.wagner@dot.ca.gov or 510-622-8758
Follow us on twitter at: https://twitter.com/CaltransD4