ADVERTISING PROJECT CROSS ALAMEDA TRAIL DESIGN – JEAN SWEENEY OPEN SPACE PARK, FISCAL YEAR 2014/2015.
The City of Alameda is soliciting bids for Design of the Cross Alameda Trail – Jean Sweeney Open Space Park, Fiscal Year 2014/2015. The project consists of engineering and landscape design services of a firm to work under the direction of Recreation and Parks staff to provide construction plans and specifications in preparation for a construction bid process.
This portion of the Cross Alameda Trail runs through the 22-acre Jean Sweeney Open Space Park (Sweeney Park) that is on the North side of Alameda in the West/Central area and is bordered by Constitution Way, Atlantic Avenue, and Sherman Street. This project also includes a 425 foot on-street trail gap closure along Atlantic Avenue between Constitution Way and Webster Street.
The work is scheduled to begin in late April 2015.
Contact: Amy Wooldridge at (510) 747-7570 or awooldridge@alamedaca.gov.
**IMPORTANT DATES**
Mandatory Prebid Meeting:
Date: Tuesday, February 17, 2015
Time: 3:00 p.m.
Location: Jean Sweeney Open Space Park – Sherman St. entrance
1925 Sherman Street
Alameda, CA 94501
Bid Opening:
The bid opening date is February 26, 2015. All bids are due no later than 2 p.m. to the City Clerk’s Office, City Hall, 2263 Santa Clara Avenue, 3rd Floor, Alameda, CA 94501. The bid opening time is 2:01 p.m.