REPAIR OF PORTLAND CEMENT CONCRETE SIDEWALK, CURB, GUTTER, DRIVEWAY AND MINOR STREET PATCHING, FISCAL YEAR 2014/2015, PHASE 15, NO. P.W. 05-14-20

The City of Alameda is soliciting bids for Repair of Portland Cement Concrete Sidewalk, Curb, Gutter, Driveway and Minor Street Patching, Fiscal Year 2014/2015, Phase 15, No. P.W. 05-14-20.  The project consists of repair or replacement of portions of sidewalk, curb, gutter, driveway and road pavement, installing temporary sidewalk, red curb painting, exposure of tree roots by air spading, and tree removal and stump grinding.

 

The work is tentatively scheduled to begin in late September 2014.

 

Download Specification and Plans

Download Addendum No. 1

 

For technical information, contact Shilpa Patel at (510) 747-7930.

 

 

**IMPORTANT DATES**

 

Voluntary Prebid Meeting

 

Date:            July 16, 2014

Time:            10 a.m.

Location:      City Hall West

                      950 West Mall Square, Conference Room 156

          Alameda, CA 94501

 

Bid Opening:

 

The bid opening date is July 30, 2014.  All bids are due no later than 2 p.m. to the Public Works Department, City Hall West, 950 W. Mall Square, Room 110, Alameda, CA 94501.  The bid opening time is 2:01 p.m.

Pre-Bid Meeting Date:
Wednesday, July 16, 2014 - 10:00
Pre Bid Location:

Bid Due Date:
Wednesday, July 30, 2014 - 2:00 pm

Bid Due Location